Page 12 out of 51 Pages ... Showing Questions in Random order from Exam |
A VDI environment based on AHV Cluster is not performing well. The current environment is using only one bridge (Bridge0). The administrator needs to verify if nodes are using all network cards associated to Bridge0. Which two menus should be used to check the current configuration? (Choose two.)
A. Network Configuration item in Settings menu
B. Host view in Network menu
C. Host NICs tab in Hardware menu
D. I/O Metrics tab in VM menu
A customer has a Nutanix cluster with 10Gb connectivity via switch fabric extenders. The administrator receives NCC health check errors of latency greater than 200ms. Which action should the administrator take to resolve the NCC errors?
A. Replace the switch fabric extenders with 10G line rate switches
B. Upgrade NCC and increase the CVM memory by 4Gb
C. Add 2 additional 10G uplinks from the switch fabric extenders per node
D. Upgrade NCC and increase the vCPU of the CVM
An administrator is migrating 5MB shares from a third-party platform to Nutanix Files with
the following characteristics:
• Shares contain user profile directories
• DFS-N will be used
How should the administrator create target shares for this migration?
A. Create multiple general purpose shares and distribute migrated data as evenly as possible.
B. Create multiple distributed shares and distribute migrated data as evenly as possible.
C. Create standard shares with multiple top-level directories and distribute migrated data.
D. Create distributed shares with multiple top-level directories and distribute migrated data.
Which two components are required to validate and Foundation a cluster with ESXi as the hypervisor? (Choose two.)
A. ISO image for ESXi
B. iso_whitelist.json
C. Phoenix Installation Tool
D. Latest NCC LCM Bundle
What reference materials should be provided to the customer during the Knowledge Transfer?
A. Questionnaire, technical slides and checklist, links to documentation and resources
B. As-Built Guide, technical slides and checklist, Network Diagram
C. As-Built Guide, Project Plan, links to documentation and resources
D. As-Built Guide, technical slides and checklist, links to documentation and resources
Explanation: During the Knowledge Transfer phase, providing the customer with the As-Built Guide, technical slides and checklists, along with links to documentation and resources, is optimal. This set of materials ensures the customer receives both detailed and high-level information, supporting a thorough understanding of the deployment and operational procedures, and it allows for easy reference to official resources for ongoing needs. References: The Nutanix Bible, NCS-Core 6.8 learning documentation, and best practices in IT project documentation.
A customer design calls for link aggregation. Despite the consultant verifying all hosts are correctly configured for fallback per Nutanix best practices, initial testing reveals the aggregate bond fails to pass traffic and shows a status of configured. What is the most likely cause for the bond disabling and reporting a "configured" status?
A. The uplinks in the bond need to be turned on.
B. The ports need to be flushed.
C. Failed negotiation due to misconfiguration on ToR switches.
D. The bond needs to be reconfigured for balance s_b mode.
Page 12 out of 51 Pages |