Page 1 out of 33 Pages ... Showing Questions in Random order from Exam |
A prospective customer wants to build a private cloud in addition to provisioning workloads across multiple public cloud providers.
Presently, the staff lacks the time and skillset for on-premises infrastructure management.
Which two features should qualify this project as a Nutanix opportunity?
(choose two)
A. Flow
B. Calms
C. Cloud Connect
D. All falsh nodes
E. Prism 1-Click operations
A customer is evaluating Nutanix to replace their existing 200TB filer. The filer is used to store archived images. To achieve maximum storage density. RF2 and Erasure Coding are proposed. What is the minimum number of nodes required to support the maximum Erasure Coding stripe size of 4/1 (data/parity)?
A. 4 Nodes
B. 5 Nodes
C. 6 Nodes
D. 7 Nodes
Explanation:
Problem Analysis:
The customer needs to replace an existing 200TB filer with a Nutanix solution.
The filer is used for storing archived images, requiring maximum storage density.
The proposal includes using RF2 and Erasure Coding with a stripe size of 4/1 (data/parity).
Erasure Coding Requirements:
Erasure Coding (EC-X) in Nutanix improves storage efficiency by distributing data and parity across multiple nodes.
A 4/1 stripe size means 4 data blocks and 1 parity block.
To implement a 4/1 Erasure Coding stripe, a minimum of 5 nodes is required to ensure the distribution of data and parity blocks.
Explanation:
RF2 (Replication Factor 2): Requires at least two copies of the data to be stored on different nodes.
Erasure Coding with a 4/1 Stripe: Requires 5 nodes to ensure there are enough blocks to store the 4 data and 1 parity blocks.
Outcome:
The minimum number of nodes required to support the maximum Erasure Coding stripe size of 4/1 is 5 nodes.
References:
For more detailed information, refer to the Nutanix documentation on Erasure Coding and storage policies.
A customer previously purchased a Nutanix solution of nine NX-3060-G7 nodes. The customer asks for help to increase the resiliency of their environment after power outages to individual racks in their datacenter Their current solution consists of two NX-3460-G7 blocks and a single NX-3160-G7 block placed in a single rack. what should the systems engineer recommend to this customer?
A. Buy three additional NX-3060 Upgrade nodes and place them into the NX-3160 block Enable Rack Awareness
B. Move on node from each NX=3460 block over to the NX-3160 blocks. Enable Block Awareness
C. Move on node from each NX-3460 into the NX-3160 block. Spread the blocks over three racks and enable Rack Awareness
D. Buy on additional node and place it, into the NX-3160 block. Spread the blocks over three racks. Enable Rack Awareness.
A systems engineer is creating a workload for a Sizer Scenario that requires Disaster Recovery (DR) resources with a Recovery Point Objective (RPO) of 6 hours. The "Protect VMs and other Entities" setting is set to Yes. Async is selected for the RPO. Which two other options must be enabled to have Sizer create a DR cluster? (Choose two)
A. Disaster Recovery
B. Backup
C. Remote Snapshot
D. NearSync
A customer who uses Nutanix for mission critical workloads is considering migrating public cloud workloads to Nutanix. The customer has experienced difficulty auditing where applications reside and understanding cloud costs on a per application basis. Which Nutanix product should be discussed to address the customer'sneeds?
A. Xi
B. Beam
C. Calm
D. Prism Pro
A prospect is evaluating vSphere alternatives and has received FUD regarding AHV. The SE gives a demo and provides relevant case studies, but the prospect still requests a POC. What additional option should the SE recommend to avoid a POC?
A. Discounted Prism Pro
B. X-Ray
C. Nutanix Technology Bootcamp
D. Xtract for VMs
Page 1 out of 33 Pages |