Nutanix NCSE-Level-1 Practice Questions

77 Questions ...

Updated On : 15-Apr-2025




Prepare with our NCSE-Level-1 practice questions and boost your chances of passing the exam effortlessly. Featuring Nutanix exam-like questions, they cover all critical topics and provide detailed explanations to enhance your understanding. Prepare smarter, not harder, and achieve your Nutanix NCSE-Level-1 certification goals effortlessly!

Page 3 out of 13 Pages

AN SE determines that a POC is necessary to overcome competitive FUD in an opportunity
with an Enterprise account evaluating several HCI solutions. The customer will evaluate
three
solutions in their datacenter simultaneously over the course of 4 days.
The customer schedules all necessary personnel to be available during this time.
Which two network planning items should the SE determine prior to allocation hardware for
the POC? (Choose two)


A.

VLAN tags


B.

CVM and hypervisor IP address


C.

TOR switch redundancy configuration


D.

Switch port type


E.

Source and number of cables





D.
  

Switch port type



E.
  

Source and number of cables



A customer is asking for a quote for a hybrid cluster to run general purpose VMs and an
ERP application containing a 500GB database. The customer has a VSAN ReadyNode
quote already and looking for a comparable Nutanix solution. They share the following
specifications
3 hosts
2 x E5-2640v4 CPU
512GB RAM
1 x 480GB SSD
2 x 8TB HDD
2 x 1GB NIC
Which two aspects of the requested configuration should cause concern and need for
further discovery? (Choose two.)


A.

2 x E5-2640v4 CPU


B.

512GB RAM


C.

1 x 480GB SSD


D.

2 x 8TB HDD


E.

2 x 1GB NIC





C.
  

1 x 480GB SSD



E.
  

2 x 1GB NIC



A prospect is replacing a 3-tier virtualization infrastructure made up of several ESXi hosts
and a SAN. The prospect recently bought a new 4-socket server to host their SQL server
workload which uses the same SAN.
Which feature allows the prospect to continue using their new server
without buying another SAN?


A.

Heterogeneous clusters


B.

Acropolis Block Services (ABS)


C.

Virtual Fiber Channel Controller


D.

Acropolis Container Services(ACS)





B.
  

Acropolis Block Services (ABS)



A prospect's business is growing 100% year over year. The prospect is interested in
Nutanix for their main datacenter due to the alility to scale quickly and easily. They have
three remote sites that will be refreshed within the next year. Each site needs to replicate to
their many datacenter. The SE proposes the Nutanix NX line, and the prospect asks to
utilize the Xpress line.
For which reason is the Xpress line the wrong choice? (Choose two)


A.

SX is limited to two 4-node clusters.


B.

SX has a lower services cost for installation.


C.

SX is limited to one 4-node cluster.


D.

SX licensing does not support cluster-to-cluster replication


E.

SX licensing will not support many-to-many- cluster replication





A.
  

SX is limited to two 4-node clusters.



E.
  

SX licensing will not support many-to-many- cluster replication



Prospective customer explains their current infrastructure and upcoming goals. They are a
fast-growing software company with approximately 3000 employees. Engineering accounts
for approximately half of total staff and is behind on product releases. 
This department has been building their own infrastructure using available hardware, SaaS
offerings, and public cloud.
There's a new CIO attempting to gain control of existing and incoming
information systems while supporting the agile environment responsible for their rapid
innovation with a minimal staff. From this information, which two addressable pain points or
gaps should be discerned?(Choose two)


A.

System availability issues


B.

SQL Server performance issues


C.

""Shadow IT"" that increases the risk of security breaches and brand damage


D.

Slow response time from the infrastructure group (SLAs) that could result in product
release delays


E.

significantly degraded end user experience





A.
  

System availability issues



D.
  

Slow response time from the infrastructure group (SLAs) that could result in product
release delays



An SE is performing a sizing exercise for a large financial institution.
They plan to move 8000 VMs to Nutanix AHV manage those clusters using Prism Central.
Which sizing configuration should the SE use for each Prism Central VM?


A.

2 vCPU / 8gig MEM /200 gig Storage


B.

4 vCPU / 16gig MEM /500 gig Storage


C.

8 vCPU / 32gig MEM /2500 gig Storage


D.

10 vCPU / 48gig MEM /3500 gig Storage





C.
  

8 vCPU / 32gig MEM /2500 gig Storage




Page 3 out of 13 Pages
Previous