Nutanix NCP-MCI-6.10 Practice Questions

76 Questions ...

Updated On : 15-Apr-2025




Prepare with our NCP-MCI-6.10 practice questions and boost your chances of passing the exam effortlessly. Featuring Nutanix exam-like questions, they cover all critical topics and provide detailed explanations to enhance your understanding. Prepare smarter, not harder, and achieve your Nutanix NCP-MCI-6.10 certification goals effortlessly!

Page 1 out of 13 Pages

An administrator is trying to configure Metro Availability between Nutanix ESXi-based clusters. However, the Compatible Remote Sites screen does not list all required storage containers.

Which two reasons could be a cause for this issue? (Choose two.)


A. Source and destination hardware are from different vendors.


B. The remote site storage container has compression enabled.


C. The destination storage container is not empty.


D. Both storage containers must have the same name.





C.
  The destination storage container is not empty.

D.
  Both storage containers must have the same name.

Explanation: Metro Availability in Nutanix requires that the primary and secondary storage containers be configured identicallyto ensuredata replication consistency.
Option C (The destination storage container is not empty) is correct:
Option D (Both storage containers must have the same name) is correct:
Option A is incorrect: Metro Availability works regardless of hardware vendor differences.
Option B is incorrect:Compression does not affect compatibilitybut may impact performance.

Refer to Exhibit:

In a scale-out Prism Central deployment, what additional functionality does configuring an FQDN instead of a Virtual IP provide?


A. Load balancing


B. Resiliency


C. Segmentation


D. SSL Certificate





A.
  Load balancing

Explanation:
When using FQDN instead of a Virtual IP in a scale-out Prism Central deployment, Nutanix enables load balancing across multiple Prism Central instances.
Option A (Load balancing) is correct because it ensures that requests are distributed among multiple Prism Central nodes, improving performance and redundancy.
Option B (Resiliency) is incorrect because resiliency is achieved through HA and replication, not through FQDN configuration.
Option C (Segmentation) is incorrect because network segmentation is handled at the VLAN or security policy level.
Option D (SSL Certificate) is incorrect because SSL certificates can be applied regardless of whether FQDN or Virtual IP is used.

Refer to the Exhibit:

An administrator needs to create two virtual machines: VM4 and VM5 that leverage the memory over-commit feature.
Once VM4 is created and running, the administrator notices that it uses only 28GB of RAM.
What will be the maximum RAM that can be allocated to VM5 so that it can be powered on?


A. 4GB


B. 8GB


C. 16GB


D. 32GB





B.
  8GB

Explanation:
Understanding the Exhibit & Memory Allocation
The host has 128GB of physical RAM.
The current memory allocation a cross three VMs (VM1, VM2, VM3) is 128GB, but only92GB is actually utilized.
This means there is36GB of unutilized memory available for allocation.
Step-by-Step Breakdown
Existing Memory Usage Before Adding VM4
After Creating and Running VM4
Maximum Memory Allocation for VM5
Evaluating the Answer Choices
(A) 4GB(Incorrect)
(B) 8GB(Correct)
(C) 16GB(Incorrect)
(D) 32GB(Incorrect)
Key Concept: Nutanix Memory Overcommit
Nutanix AHV supports memory overcommit, meaning VMs can be allocated more memory than physically available using memory ballooning and swapping.
However, to power on VM5 without impacting performance, it must fit within the available unutilized memory, which is 8GB.

Refer to Exhibit:

An administrator sees the alert shown in the exhibit.
What should the administrator do to ensure the nutanix user can no longer SSH to a CVM using a password?


A. Rename the nutanix user.


B. Block port 22 on the CVM firewall.


C. Enable Cluster Lockdown.


D. Delete the nutanix user.





C.
  Enable Cluster Lockdown.

Explanation:
Understanding the Exhibit & the Alert
The alert states:
"The cluster is using password-based SSH access for the CVM."
"Password-based remote login is enabled on the cluster."
"It is recommended to use key-based SSH access instead of password-based SSH access for better security."
This means that the nutanix user can log in to Controller VMs (CVMs) using a password, which is a security risk.
Corrective Action: Enabling Cluster Lockdown
(C) Enable Cluster Lockdown. (Correct Answer)
Cluster Lockdown Mode restricts password-based SSH access and forces keybased authentication.
This prevents users from logging into CVMs using passwords, enhancing cluster security.
To enable Cluster Lockdown:
Evaluating the Other Answer Choices
(A) Rename the nutanix user. (Incorrect)
The nutanix user is a built-in system account required for cluster operations.
Renaming the user will not prevent SSH access via password.
(B) Block port 22 on the CVM firewall. (Incorrect)
Blocking port 22 (SSH) will completely disable SSH access, including key-based authentication.
This may break cluster management and troubleshooting operations.
(D) Delete the nutanix user. (Incorrect)
The nutanix user is a critical system account required for cluster functionality.
Deleting the account will cause serious issues with cluster management.

Refer to Exhibit:

An administrator is looking at thememory cluster runway diagramas shown in exhibit,in Prism Central. The environment has three hosts with the following configuration:
CPU: 2x Intel Xeon Gold (8 cores, 2.6 GHz)
RAM: 256 GB per host
Storage: SSDs and HDDs
The Intelligent Operations feature has been active for one month, but no further configurations were applied.
What does the dotted red line mean?


A. It is the default trend analysis static threshold that can be manually set.


B. It is the maximum memory the administrator can assign to VMs.


C. It is the calculated memory oversubscription limit for currently running VMs.


D. It is the usable capacity based on cluster configuration options.





D.
  It is the usable capacity based on cluster configuration options.

Explanation:
The Prism Central Memory Cluster Runway Diagram provides insights into memory usage trends, predicting how long the cluster can sustain workloads before exhausting resources.
The solid blue area represents the actual memory consumption over time.
The dotted red liner presents the effective memory capacity limit based on the cluster's current configuration.
Analyzing the Dotted Red Line
The dotted red line is labeled "Effective Capacity: 503.22 GiB", which means:
It is the total usable memory capacity IN the cluster after considering hypervisor overhead, redundancy settings, and failover capacity.
This value is not a hard limit but an indication of the available memory before potential performance issues occur. 
Evaluating the Answer Choices
(A) It is the default trend analysis static threshold that can be manually set.(Incorrect ) The dotted red line is not a static threshold that an administrator can manually configure.
Trend analysis in Prism is dynamic and based on workload history and projections.
(B) It is the maximum memory the administrator can assign to VMs.(Incorrect) Administrators can over subscribe memory beyond the dotted red line if memory over commitment is enabled.
However, oversubscribing memory beyond effective capacity may impact performance.
(C) It is the calculated memory oversubscription limit for currently running VMs.( Incorrect)
The dotted red line does not represent oversubscription limits.
Memory oversubscription depends on hypervisor memory ballooning, compression, and swapping mechanisms, which are not directly shown here.
(D) It is the usable capacity based on cluster configuration options.(Correct Answer)
The dotted red line (503.22 GiB)represents the actual usable memory available in the cluster after factoring in system overhead.

Refer to Exhibit:

An administrator notices the message shown in the exhibit when navigating to LCM from Prism Central.
Which action should the administrator take to update LCM to the latest version?


A. Run anAOS upgrade.


B. Run anAHV upgrade.


C. Perform an Inventory Scan.


D. Download and install the latest LCM version from a CVM.





C.
  Perform an Inventory Scan.

Explanation:
When Life Cycle Manager (LCM) reports that a newer framework version is available, the correct action is to perform an inventory scan (Option C).
Performing an inventory scan updates the available firmware/software versions and allows LCM to download required updates.
Option A (Run an AOS upgrade)is unrelated to the LCM framework update process.
Option B (Run an AHV upgrade)is a separate component update and does not affect the LCM framework.
Option D (Download manually from a CVM)is not necessary because LCM updates are automatically pulled after an inventory scan.


Page 1 out of 13 Pages

About Nutanix NCP-MCI-6.10 Exam

Nutanix offers official training courses to help you prepare Nutanix core infrastructure administration and Nutanix advanced administration and optimization. Set up a lab environment to practice deploying, configuring, and managing Nutanix clusters. Prepare Nutanix NCS-Core practice questions and join Nutanix communities to ask questions and share knowledge.

Key Topics:

1. Manage VMs within a Nutanix Multicloud Environment
2. Manage Clusters within a Nutanix Multicloud Environment
3. Configure Disaster Recovery and Data Protection within a Nutanix Multicloud Environment
4. Troubleshoot a Nutanix Multicloud Environment
5. Conduct Custom Monitoring within a Nutanix Multicloud Environment

How to Prepare Nutanix NCP-MCI-6.10 Exam?

To prepare for the NCP-MCI 6.10 exam, it is recommended to complete the Nutanix Enterprise Cloud Administration course. Use practice tests to get a feel for the types of questions that will be on the exam. You can find Nutanix NCP-MCI-6.10 practice questions at Nutanixacademy.com. Reviewing official Nutanix documentation and guides can help reinforce your understanding of key concepts and procedures. Nutanix University offers a playlist of instructional videos that cover technical demos and how-to guides relevant to the exam. Simply reading through study materials without hands-on practice can limit your understanding. Use a lab environment to practice real-world scenarios and reinforce your knowledge. Skip tricky questions first, manage time (90 mins for 60 Qs), and eliminate obviously wrong answers to narrow choices.

Final Checklist:

✅ Completed Nutanix ECA/Microcourses?
✅ Labbed AOS 6.10 features?
✅ Scored >80% on NCP-MCI 6.10 practice exam?
✅ Reviewed Nutanix 6.10 docs & release notes?